Professional Consulting / Surveys / Design Services

  • Abatement design
  • Incidental disturbance assessments
  • Hazard Assessments
  • Comprehensive Operation and Maintenance Plans(manage Asbestos in-place)
  • AHERA Re-inspection Reports
  • Asbestos surveys (prior to renovation and/or demolition)
  • Site specific variances
  • Construction administration

Project Monitoring Services

  • Air Monitoring Abatement / Demolition (PCM & TEM)
  • Project Design
  • Project Monitoring
  • Post abatement visual clearance
  • Site Specific Variances: These are needed when there are practical difficulties in complying with Code Rule 565, DOL may provide relief in the form of a variance decision.

Testing

  • Air TEM Sampling
  • Bulk Friable / Non-Friable
  • Asbestos dust sampling and analysis
Contact Us