Professional Consulting / Surveys / Design Services
- Abatement design
- Incidental disturbance assessments
- Hazard Assessments
- Comprehensive Operation and Maintenance Plans(manage Asbestos in-place)
- AHERA Re-inspection Reports
- Asbestos surveys (prior to renovation and/or demolition)
- Site specific variances
- Construction administration
Project Monitoring Services
- Air Monitoring Abatement / Demolition (PCM & TEM)
- Project Design
- Project Monitoring
- Post abatement visual clearance
- Site Specific Variances: These are needed when there are practical difficulties in complying with Code Rule 565, DOL may provide relief in the form of a variance decision.
Testing
- Air TEM Sampling
- Bulk Friable / Non-Friable
- Asbestos dust sampling and analysis
Contact Us